Your customer reads the total first, then what is in and what is out, then when you can start, then how to say yes. A quote that answers those four, in that order, and arrives while the job is still on their mind, wins more often than a cheaper one that turns up late and makes them hunt.
That is our judgement, from writing our own quotes and reading them the way a customer does. Price still matters. It gets read in a few seconds, and the rest of the page decides whether the customer believes it.
A slow or muddled quote costs you the job, and the evening you spent writing it. A clear one makes the evening count.
How long should a quote take?
Long enough to be right, and no longer than the customer takes to decide. For a small job, that usually means the same day or the next. For a job that needs a site visit or a supplier's price, give the customer a date for the quote, and keep it.
Speed tells the customer how you will run the job. A quote that arrives when you said it would is the first promise you keep. The first reply to an enquiry matters even more, and that part is in the post on the 9 pm enquiry.
What does a customer read first?
Four things, in this order.
- The total. One figure, near the top, with GST included and said. The ACCC's guidance on price displays says businesses must show "the total price of a product or service as a single figure", including taxes and any unavoidable fees, and that where a part price is shown, "the total price must be at least as prominent" (ACCC, price displays). It is written for advertised prices, and it is a good standard for a quote.
- What is in, and what is out. Your customer has been told to check. Consumer Affairs Victoria's guide to getting building quotes tells people to "compare at least three written quotes", and warns that "the cheapest may not include some items" (Consumer Affairs Victoria, getting quotes). So write the exclusions down, each with its reason: "Council fees, paid by you directly to council." A reason turns an exclusion into an answer.
- The start date. Add roughly how long the job takes. "Subject to availability" reads as no date at all. Give the price an expiry date too. Without one, Business Queensland's guide warns, you may have to honour a price that no longer covers your costs (Business Queensland, preparing a business quote).
- How to say yes. One step: reply yes to this email, sign here, or pay the deposit at this link. The same Queensland guide says to get a signature or written confirmation before you start work or order materials, because a quote, once accepted, becomes a legally binding contract. In NSW, residential building work over $5,000 including GST needs a written contract as well (NSW Government, building contracts).
Quote or estimate?
Business Queensland describes an estimate as a rough guide that is not legally binding and usually says the price may change. A quote is your worked price, and it binds you once the customer accepts. If you cannot price the job yet, send an estimate and call it one.
Does the cheapest quote win?
Less often than owners fear. The Victorian guide above says the cheapest may leave things out, and the NSW Government lists a quote "which seems extremely low compared to others" as a warning sign. When three quotes sit side by side, the clear one is the easiest to trust, and the easiest to say yes to.
What did we learn writing our own?
That a first draft says too much. On one of our own recent proposals, the first version showed a standard price struck through beside a lower introductory one, a line asking for a testimonial in return, and optional extras at a price each.
Read the way the customer would read it, the page raised three questions before it answered one. Which price is real? If it is half off, is the work cheap? What do the extras get me? We cut it to one price. The testimonial became something to ask for after the work is delivered. The extras went.
The second round set the options out in separate cards, and it was hard to see which one included what. It became one table: a row for each thing delivered, a column for each option, a tick where it is included, the price at the foot. A customer can now answer "what is in?" in a few seconds. That is the page's whole job.
Should a quote look like your business?
Yes. It is often the first document of yours the customer keeps, and it gets forwarded to whoever else has a say. Put your name and logo at the top, the customer's name and the job on the first line, and give it the same look as your invoices and your website.
Name the file for the customer, too. "Smith kitchen, quote from Your Business.pdf" reads better in their inbox than "quote_final_v3.pdf". We name our own proposal files this way for the same reason.
Where does it go wrong?
- Lines with no total. The customer adds them up, gets a different figure, and now doubts every line.
- An estimate sent as a quote. When the price moves, you either wear the difference or start an argument.
- Saying yes buried in the terms. If accepting takes a phone call, a printer and a scanner, a busy customer waits.
- Speed bought with mistakes. A quote that arrives in an hour with the wrong scope costs more than one that takes a day and is right.
Leave it alone when your quotes already go out within a day, with one total and a plain way to say yes. Your next win is in the follow-up.
One step for this week
Take your last three quotes. Hand each one to someone outside the business, give them ten seconds, and ask four questions: what is the total, what is not included, when can you start, and how do I say yes? Anything they could not find in ten seconds moves to the first page.
Once the quote is out, chase it to an answer. That part is in quotes go cold in silence.
Quotes that look like yours, ready to send, are one of the eight things we build. See them in section 02.

